twin brooks - stormwater underground storage
lower sackville, ns
|
project description:Stormwater peak flow reduction was required and no space was available for conventional stormwater management ponds so storage was accomplished using oversized storm sewer pipes. The pipes were sized to control the peak runoff from the 10-year storm and an overflow was provided for the less frequent, more intense storms.
kvm's role:KVM completed the stormwater modeling to determine the pipe and outlet sizing. KVM then completed the detailed design, tender documents, contract administration and inspection.