PH  902 864 2267   |   kvmconsultants@eastlink.ca
  • Home
  • Profile
  • Services
  • Projects
    • Land Development
    • Site Servicing
    • Environmental Protection
    • Streetscaping & Waterfronts
    • Recreation
    • Septic Systems
    • Municipal Engineering
  • Contact us

project library

twin brooks - stormwater underground storage 
lower sackville, ns

project description:

Stormwater peak flow reduction was required and no space was available for conventional stormwater management ponds so storage was accomplished using oversized storm sewer pipes.  The pipes were sized to control the peak runoff from the 10-year storm and an overflow was provided for the less frequent, more intense storms.

kvm's role:

KVM completed the stormwater modeling to determine the pipe and outlet sizing.  KVM then completed the detailed design, tender documents, contract administration and inspection.

Categories:

Municipal Engineering 

NAVIGATION

CAREERS
CLIENT LOGIN
PROJECT LIBRARY
PROFILE
SERVICES
 

CONTACT 

51 Cobequid Road, Unit 202
Lower Sackville, NS
B4C 2N1

PH: 902-864-2267
FAX: 902-864-3632