project library
rails to trails
chester, ns
|
Project description:46 kilometres of abandoned railway was converted to a multi use trail system. The Chester portion of the trail system spans from Martin's River to Hubbards as a part of the larger "Rails to Trails" system that beginning in Lakeside.
kvm's role:KVM Consultants was involved in the Municipality’s rails to trails infrastructure including, tender document preparation, tendering, services during construction, advisory on perceived drainage issues and mitigation of peak storm water flows, advisory on bridges and associated concrete repairs.
Categories:Recreation
|