five island lake Estates 
hubley, NS

project description:

An unserviced 120-lot residential development in Hubley, south of Halifax along Highway 103.  There were a number of environmentally sensitive areas (wetlands, watercourses) within the development that required care and attention in the design and construction of the streets and services.  The developer also constructed a new left turning lane on Highway No. 3 at the entrance to the development.

kvm's role:

KVM was involved from the concept development stage up to construction and certification of the streets and services.  KVM completed the detailed design, prepared construction cost estimates and contract documents, administrated the construction contract, provided construction inspection services, and prepared the record drawings and municipal takeover package. 

KVM also completed the detailed design, construction inspection and certification of the new turning lane on Highway No. 3.

Categories:

Land Development 
Municipal Engineering
Environmental Protection

Turning Lanes
Recreation
Project Administration

NAVIGATION

CAREERS
CLIENT LOGIN
PROJECT LIBRARY
PROFILE
SERVICES
 

CONTACT 

51 Cobequid Road, Unit 202
Lower Sackville, NS
B4C 2N1

PH: 902-864-2267
FAX: 902-864-3632