project library
douglas Road Sewer
western shore, ns
|
project description:The project consisted of replacing 150m of existing 150mm diameter sanitary sewer with a new 200mm diameter sewer and manholes.
kvm's role:KVM provided services including pre-design, pretender capital cost estimates, detailed design, tender document preparation, tendering and award, and inspection and contract administration support services during construction and warranty. The Municipality’s assistant engineer acted as resident engineer under direction of KVM.
Categories:Municipal Engineering
|